RISKS PREVENTION STUDIES

  • For enterprises or groups that desire to obtain an optimal risks program
  • For the industry in general
  • For insurances companies
  • For reinsurers

BENEFITS IN INSURANCES

  • Complete information for reinsurers
    • Audited reports for international enterprises
    • Accepted reports in the international reinsurance market
  • Groups not justified only by the ten most important locations
  • Premiums not determined by the location with the worst risk
  • Conditions correctly determined by the risk profile of all the locations

SELECTION AND INSPECTION

  • Selection of the most important properties by:
    • Values
    • Accident rate Interdependency among the group enterprises
  • Risks engineering inspections
    • Know the properties
    • Develop the risks profile
    • Develop the risks matrix
    • Evaluation of risks scenarios
    • Estimate of probable maximum lost

REPORTS

  • Reports
    • Detailed
    • Precise
    • Complete
    • Accepted in all the insurance market
  • Coverage
    • Material damage
    • Boilers and machinery breakdown
    • Consequential loss
    • Merchandise Transport
    • Money and values
  • Distribution
  • Fort the risks administrator
    • For the insurance broker
    • For the insurance company
    • For the reinsurers
  • For the inspected location
  • For similar locations of the group

TIME

  • Inspections direct damage and consequential loss
    • 2 months after the renovation of the insurance program
  • Reports
    • 3 months after the renovation of the insurances program (Spanish 1 month, later in English)
  • Support (on the costumer’s demand) Continuously
    • LCS could contact reinsurers
    • LCS will give counseling on the costumer’s demand

UPDATE

  • Visit to the previously inspected properties
  • Review the progress and implementation of previous recommendations
  • Self-audits
    • With the own team of the group
  • Locations not visited previously
  • New reports

SELF-AUDITS

  • Selected team by the group
    • Multi-disciplined
    • With experience
  • Training by LCS
    • In classrooms and in the field
    • Inspections
    • Reports formats
    • Risks profiles
    • Risks matrix
    • Estimates of maximum loss
  • Visits program
    • With LCS
    • Only the group team for other plants
    • Only the team group for re-inspections

STATUS OF LOCATION RISKS

  • Improvements of risks in the locations
    • Modification / optimization of the insurances program?
    • Adjustment of the insured amounts?
    • Modification of deductibles?
    • Modification of withholding risks?
  • Verification of the implementation quality
    • Economic considerations
    • Engineering standards
    • Security standards
    • Protections against fire standards
  • Global applications
    • For similar locations in the group?
    • For all the locations in the group?

TIME 2

  • 3-4 months before the renewal of the insurances program
  • Before the visit of the reinsurers for:
    • To assure that the recommendations will be done before de renewal
    • Time to adjust the insurance program
    • Time to prepare reports
    • To have assured the update of the reports P

REPORTS 2

  • Compositions of the reports
    • Included all the visited properties (by LCS or by the group team)
    • Update of PMLS´S
    • Profile of the risks improvements
    • Reports of the group team audited by IES
  • Time
    • 3 months after the renewal of the insurances program (Spanish 1 month, in English later)
  • Distribution
    • For the risks administrator
    • For the insurance broker
    • For the insurance company
    • For the reinsurers
  • For the inspected location
  • For similar locations of the group

DEVELOPMENT

  • Standards
  • Emergency plans
    • Plans for handling fire events
    • Evacuation plans
  • Contingency plans
    • Equipment substitution
    • Location alternatives, etc.
  • Procedures
    • Security
    • Fire preventions
    • Inspections
    • Quality assurance
    • Maintenance
  • Consequential losses and optimization of interdependencies

TIME

  • After phase 2
  • Continuous program
  • Revision and continuous auditing

RESULTS

  • A complete knowledge of the group risks
  • A better risks management
  • Optimization of risks retention
  • Complete information for reinsurers
  • Optimal insurance program and finally, financial savings

<<Back to Audit